New connection – no point of supply infrastructure installed (1,2,8,11) $2,227.00
Addition or reduction of water to an existing scheme tank (1,2) $653.00
Transfer of units between two existing tanks $843.00 plus actual material costs
Shifting location of existing restrictor to new position on property (2,3) $2,301.00
On-Demand Water Supply
New connection – no point of supply infrastructure installed (1,8,11) $2,094.00 + actual excavation and reinstatement costs
New connection – meter installation only (1) $816.00
50mm or larger new connection (1,2,6,8,11) $1,021.00 + actual installation, material and reinstatement costs
Termination fee per disconnection $517.00
Meter calibration test (9) Actual cost
Meter reading on request $84.00
1 cubic meter of water obtained from a certified tanker filling station $6.080 per m3
Water Modelling Fees
Standard modelling fee – standard application (to be completed with each application) (2) $432.00
Hydraulic modelling (non-standard) – e.g. bulk assessment (9) Minimum $432.00 + $239.00 per additional hour
Engineering subdivision works – pre-application $142.00 per hour
Miscellaneous Water Charges
Replace restrictor unit only, for reasons other than fair wear and tear (6) Actual cost
Emergency additional supply (4) $421.00
Swimming pool fill – working hours, Monday -Thursday only (4) $482.00
Fee for resetting restrictor after tampering – first time Actual cost
Resetting restrictor after tampering – second time $2,032.00 and possible prosecution and restriction of water supply
Detected illegal water takes $2,032.00, actual costs and possible prosecution
Water Officer callout rate where the issue was not in HDC network (5) $155.00 per hour
Water Engineer – all other processing, auditing, inspections and analysis conducted by Engineer not included in standard water applications or queries $150.00 per hour
Costs for unauthorised connection and/or breach of the 3 Waters Bylaw $2,137.00

 

  1. A development contribution is applicable for all schemes (refer to the Development Contributions schedule).
  2. All water applications will incur a non-refundable modelling fee.
  3. In addition to the fee, the actual cost of plant, labour and materials will be payable.
  4. Supply between 1 November and 1 March is subject to availability. Based on a maximum increase in the supply of 10,000 litres.
  5. Only charged for callouts occasioned by property owner’s actions or equipment.
  6. Material only. In addition to the charge the actual cost of travel will be payable.
  7. Costs will be individually assessed as the backflow prevention risks vary.
  8. For new connections to take water from an existing Council water supply, Council will meet the costs of the new connection for up to the first 20 metres inside the road reserve from the point of water supply. The consumer will be required to pay any additional costs to connect to the water supply network.
  9. Charge for calibration test based on request from property owner. Refund of charge if calibration test proves faulty meter. Charge stands if meter is accurate.
  10. Additional hourly assistance would include for dispute resolution on modelling if unfounded and additional modelling scenarios if presented.
  11. Additional costs will apply to network extensions, if required.

HURUNUI WASTEWATER (SEWER)

Wastewater Fee
Connection application – administration charge (1,2) $300.00 + actual costs
Leithfield Road sewer extension charge (for properties previously on the private pumped line) $4,031.00
Leithfield Road sewer extension charge (for properties which have not previously paid a capital contribution) $5,116.00
Osborne Road sewer extension charge $1,621.00
Douglas Road sewer extension charge $1,410.00
Water Officer callout rate where the issue was not in HDC network $155.00 per hour
Wastewater Modelling Fee
Hydraulic Modelling (non-standard) – e.g. bulk assessment Minimum $432.00 + $239.00 per additional hour (3)
Engineering subdivision works – pre-application $142.00 per hour
Combined Water/WW modelling fee Minimum $716.00 + $227.00 per additional hour
Costs for unauthorised connection/discharge and or breach of the 3 Waters Bylaw $2,137.00

 

  1. In addition, a development contribution is applicable for some schemes (refer to the Development Contributions schedule).
  2. For new connections to connect to the wastewater system, Council requires the consumer will be required to pay for the cost to connect from the point of the wastewater system
  3. Additional hourly assistance would include for dispute resolution on modelling if unfounded and additional modelling scenarios if presented.
  4. Connections to a waste water supply during the year will be charged on a pro-rata basis for the number of months remaining in the financial year. Sewer rates will be charged in the usual rates demand from the following year onwards.

HURUNUI STORMWATER

Stormwater Connection Fees
(For discharge consents covering Amberley, Hanmer Springs & District Wide Urban Areas)
Connection application – indirect connection $547.00
Connection application – direct connection $295.00
Engineering subdivision works – pre-application (first meeting up to 2 hours free) rate per additional hour $142.00 per hour
Costs for unauthorised connection/discharge and/or breach of the 3 Waters Bylaw $2,137.00

Kaikōura District Council

To look up the rates for your Kaikōura property, please visit – https://www.kaikoura.govt.nz/property-rates-building/rates/look-up-your-rates

Water Unit Charges

Applies to the purchase of new units of water. These charges are in addition to service approval fees and development contributions (if any).

Fernleigh – $1,213.00
Kincaid – $1,213.00
Peketa – $1,213.00
Suburban – $1,450.00
Oaro  – $1,213.00
East Coast – $1,213.00

Service Approval Fees

Applies to each of water, wastewater, and stormwater services.

Per service – $285.00

Change in Restrictor Size

Applies to either an increase or a reduction in the size of restrictor.

All supplies – $132.00

Physical Works

All costs associated with connection, shifting location, or other physical work related to water supply such as pipes, toby, restrictor, backflow preventer, meter and any other components.

Actual costs of plant, labour and materials.

Meter Reading Fee (Extra)

Applies to any meter reading required to be taken outside the usual meter reading schedule (such as a final meter reading)

All supplies – $79.00